Project #6

Services rendered

Services rendered

Key features

Structural Layout Optimization

The overall structural layout was optimized to ensure efficient load transfer, reduce material usage, and improve coordination between architectural and engineering elements

Column locations were carefully adjusted throughout the building to simplify the structural grid, improve space utilization, and minimize the need for transfer structures.

The structural system was designed with clear and direct load paths to ensure stability, improve performance, and reduce unnecessary structural complexity.

Beam and slab systems were coordinated across all floors to achieve uniform distribution of loads and simplify construction sequencing.

Get in Touch with Our Experts

Project team

Doris Jordan

Design Expert

Diana Wagner

Project manager

Johnny Ramirez

Director

Our Projects

Explore the projects that showcase Voke Build's commitment to quality, integrity, innovation, and exceptional craftsmanship. Every project reflects our dedication to delivering outstanding results and exceeding client expectations.

Project #1

Brook Residence

Project #2

29th Street Building

Project #3

Marbledale Road

Project #4

Prospect Road

Project #5

Central Avenue Parking Garage

Project #6

Smith Residence